CAMINADA

Description: Design & Construction
Type of building: Industrial facility
Project timeline: 2O17-2O18
Location: Subotica, Serbia
Area: 24OO m²

Project info
How did we did it

  • The subject of this project is the design of an industrial assembly hall intended for production and for the needs of the Caminada company. The place of construction is Subotica.

    The building has a rectangular base with dimensions of 90x24m, clear height of 7.5 m.

  • The structural system is frame-based, which consists of a transverse frame with two AB columns of cross section of 60x50 and 50x50 cm and the main trussed concrete support with a span of 24.0m.

  • The supporting system of the transverse frame consists of prefabricated reinforced concrete columns with dimensions of 60x50 and 50x50 cm in a 10m grid. An AB cup is left on the top of the columns, which is monolithic and thus connects the roof supports.

    In the administrative part, there are internal pillars with a cross section of 40x40 cm.