Hutchinson, Ruma

Description: Design & Construction
Type of building: Industrial facility
Project timeline: 2O15-2O21
Location: Ruma, Serbia
Area: 3OOOO m²

Project info
How did we did it

  • The subject of this project is the design of industrial facility - a factory for the production of water pipes under low pressure of the 'HUTCHINSON' company in Ruma.

    There are three technological units within the buildings:

    Administrative block
    Production block
    Logistics

  • The constructive system of the newly projected facility is divided into two constructive units connected by the row of columns. Both units are of a skeletal constructive system that consists of longitudinal and transverse AB frames.

  • The construction of the facility is precast reinforced concrete, composed of prefabricated elements: AB adhesionly prestressed purlins "T" section.